Next, industrial painters will be employed to prepare the surface and apply a protective coating to ensure the effects of corrosion are limited.įinally, the building crews will get their hands on the steel building frame and secure the walls and roof to it. However, pre-engineered steel buildings will have all of the key pieces made, and shipped piecemeal over a period of time. This typically includes the base of the building and the skeleton structure of the walls and roof. Once the construction begins, the material will be ordered and assembled through welding and various other construction processes until the building frame is complete. They will prepare bids based on the material and labor costs associated with the engineering firm’s design, as well as scheduling the progress of the work and clarifying their scope of work.įinally, once the construction company has been selected, many engineering companies will conduct an audit of the construction facilities to ensure the proper safety, quality, and production standards can be adequately met by the construction company. Therefore, the second stage is the bidding process of construction companies. From these myriad designs, a decision will be made on who will complete the work. Here, engineering firms will pour through the specifications and requirements of the client, and design the building they wish to build. However, these are just possible considerations that must be taken into account, and the stages after construction may go unchanged.ģ Pre-Stages of Steel Building Developmentĭuring the initial bidding phase of the steel building construction, there will be approximately 3 stages. This is essentially a bend in the middle of the structure that will prevent proper placement and alignment of the pieces that must be joined to the steel building. In other instances, the length of the building may be long enough that several extra supports and braces are required in order to prevent it from having a positive or negative camber. This will, of course, involve extra fixtures and shoring for when both halves are joined together. For instance, if the building will be exceptionally wide, it may be split in two so that effective transport can be made.

The stages for steel building development change based on the size and purpose of the structure.